Skip to content
Avecas

LOGIC SYNTHESIS

Logic synthesis

Map RTL into implementation cells under defined timing and area constraints.

Discuss your requirements
Integrated circuits and passive components beside a printed schematic

Representative photograph · Integrated circuits and passive components beside a printed schematic.

THE ENGINEERING SCOPE

Built around
your requirements.

Explore the approach ↓
01

Technical starting point

RTL, libraries, operating corners and timing intent.

02

Acceptance evidence

Latches, inferred structures, timing constraints and equivalence.

03

Delivery package

Mapped netlist, constraints, reports and transformation notes.

CLIENT GUIDE

Scope logic synthesis with the right evidence.

Use these technical checkpoints to make the first project review productive.

Provide before the review

  • Rtl
  • Libraries
  • Operating corners and timing intent

Review during execution

  • Latches
  • Inferred structures
  • Timing constraints and equivalence

Agree for delivery

  • Mapped netlist
  • Constraints
  • Reports and transformation notes

HOW WE WORK

Clarity at each stage.

01

Check elaboration

The initial review establishes the baseline using RTL, libraries, operating corners and timing intent. Record gaps and dependencies before implementation.

02

Apply constraints

Carry out the agreed work against the reviewed baseline. For logic synthesis, keep the interfaces and configuration used by this stage visible to the receiving team.

03

Synthesise

Retain the intermediate artifacts and review latches, inferred structures, timing constraints and equivalence. Investigate failures before using these results as an input to the next stage.

04

Review mapped results

Package mapped netlist, constraints, reports and transformation notes. Review unresolved findings against the agreed acceptance criteria and assign ownership for follow-up.

PROJECT DECISIONS

Know what moves the work forward.

Use these gates to agree readiness, review evidence and responsibility at each stage.

  1. 01

    Baseline ready

    Are the starting inputs complete enough to proceed?

    Review method and evidence

    RTL, libraries, operating corners and timing intent.

    Review evidence

    Record input revisions, missing material and who can resolve each dependency.

  2. 02

    Implementation reviewed

    Has the work addressed the agreed technical objective?

    Review method and evidence

    Map RTL into implementation cells under defined timing and area constraints.

    Review evidence

    Keep the intermediate artifacts with review comments and the decisions that changed the design.

  3. 03

    Evidence checked

    Can the result be reproduced and interpreted?

    Review method and evidence

    Latches, inferred structures, timing constraints and equivalence.

    Review evidence

    Capture the configuration, expected result, observed result and unresolved findings.

  4. 04

    Handoff accepted

    Can the receiving team use the delivery package?

    Review method and evidence

    Mapped netlist, constraints, reports and transformation notes.

    Review evidence

    Review build or execution instructions, known limitations and ownership of follow-up actions.

INPUTS & OUTPUTS

What the work involves.

The final statement of work defines the scope and acceptance criteria.

Client inputs
RTL, libraries, operating corners and timing intent.
Engineering sequence
Check elaboration; apply constraints; synthesise; review mapped results.
Outputs to agree
Mapped netlist, constraints, reports and transformation notes.

TECHNICAL DECISIONS

Planning logic synthesis.

Read the technical guide

The engineering objective

Map RTL into implementation cells under defined timing and area constraints.

The work starts from RTL, libraries, operating corners and timing intent. The team should identify the authoritative revision of each input and record any assumptions needed to proceed. This prevents a later result from being interpreted against a different specification or configuration.

What needs technical attention

Optimisation can only target the constraints supplied; incomplete constraints can produce misleading results.

The review centres on latches, inferred structures, timing constraints and equivalence. Each finding should identify the input revision, observed behaviour and supporting evidence. Distinguish a confirmed defect from a configuration issue, an unsupported case or an open engineering question before deciding how to resolve it.

How the work is reviewed

The practical sequence is: check elaboration; apply constraints; synthesise; review mapped results. Intermediate reviews allow the client to resolve decisions while changes are still manageable. If an input changes, identify the affected activities and repeat the checks that depend on it.

The expected package comprises mapped netlist, constraints, reports and transformation notes. Acceptance criteria should specify what the receiving team needs to reproduce, inspect or integrate these artifacts. Include known limitations and outstanding actions in that package, rather than assuming that delivery of a file implies acceptance.

Make the interface contract executable

A specification becomes useful when the team can distinguish legal behaviour from a defect at each interface. Record which side drives a transaction, when data becomes valid, how backpressure works and what happens if reset arrives during a transfer. Register descriptions should state access permissions, reset values and side effects. Configuration parameters need a supported range; a design verified in one configuration should not automatically be treated as verified in every configuration.

Performance requirements need a workload and an observation point. Specify whether a latency target measures an isolated transaction or a stream under contention. State how throughput is counted when requests stall, retry or cross clock boundaries. This makes architecture reviews more productive: a buffer, pipeline stage or arbitration change can be compared against an explicit requirement rather than a headline frequency.

Keep functional verification, structural checks and implementation feasibility as distinct review activities. A successful compile, proof or synthesis run answers the question posed by its setup; it does not establish that the setup covered the entire product requirement. Review assumptions, exclusions and unsupported modes alongside the result. Where an interface is supplied by another team, agree a small integration test and its expected response before connecting the full subsystem.

An illustrative review scenario

Consider a producer that can issue consecutive requests while its consumer occasionally stalls. Review whether the interface preserves ordering, holds data stable and resumes without losing a request. Add a reset during the stall and a boundary-length transfer. Record the expected behaviour first, then retain the test and result with the design revision. This is an illustrative review scenario, not a claim about a delivered client project.

BEFORE WE BEGIN

Project questions.

A clear conversation is the start of a strong engineering relationship.

What inputs are needed for logic synthesis?

The starting review needs RTL, libraries, operating corners and timing intent. Share the current revision and known limitations so the scope reflects the actual design state.

What does the logic synthesis handoff include?

The statement of work can define mapped netlist, constraints, reports and transformation notes. The final package should include review results and any open actions.

Which technical risks need particular attention?

Optimisation can only target the constraints supplied; incomplete constraints can produce misleading results.

Can we start with a focused technical review?

The first work package can be a review of the available inputs and the engineering questions that must be resolved. Agree its boundaries, access requirements and expected findings before committing to a larger implementation. A review should leave an actionable list of decisions, dependencies and next steps.

How are changes and unresolved findings handled?

Tie each finding to the relevant revision and supporting evidence. A change should identify the affected interfaces, activities and checks. Confirm its effect on scope and delivery with the responsible owner. At handoff, distinguish closed findings, accepted limitations and open work so that a file transfer is not mistaken for technical acceptance.

PUT THE WORKFLOW IN CONTEXT

Explore the engineering decisions.

Practical reading to help prepare your project discussion. Studies are illustrative; they do not report client results.

Reviewing a congested floorplan before timing closure ↗

YOUR NEXT CHAPTER STARTS HERE

What will you
build next?

Bring us your engineering challenge.
Let’s define the path from idea to implementation.

Start a conversation