Skip to content
Avecas

TURNKEY IC DESIGN

One engineering plan.
From specification to handoff.

Bring design, verification, implementation, and delivery into a clearly scoped engagement. Agree the milestones, interfaces, and acceptance evidence before execution begins.

Discuss your requirements
Engineering team reviewing a prototype at an electronics workbench

Illustrative engineering photography.

THE ENGINEERING SCOPE

Built around
your requirements.

Explore the approach ↓
01

Architecture to implementation

Define the specification, microarchitecture, RTL, integration requirements, and implementation targets as one coordinated work package.

02

Verification with evidence

Agree a verification plan, coverage goals, review gates, and traceable issue resolution for the selected design scope.

03

A controlled handoff

Deliver the agreed sources, reports, constraints, documentation, and open-issue register. Foundry, packaging, and test responsibilities are scoped explicitly.

THE DELIVERY WORKFLOW

Six stages.
Clear decisions at every step.

Activities overlap and iterate as the design evolves. Each stage has an agreed evidence package and a review decision before downstream work proceeds.

  1. 01

    Requirements & architecture

    Review product use cases, interfaces, performance, power and area targets. Confirm technology dependencies, available IP and the division of responsibility before committing the delivery baseline.

    Review evidence

    Requirements baseline, interface map, milestone plan and risk register.

    Decision Agree the specification and acceptance criteria.

  2. 02

    RTL & IP integration

    Develop or integrate the scoped logic and IP. Review clocks, resets, register maps and interconnect assumptions; check the selected baseline for lint and clock/reset-domain issues as applicable.

    Review evidence

    Versioned RTL, IP configuration, integration notes and review findings.

    Decision Accept the integration baseline and resolve blocking issues.

  3. 03

    Verification & test readiness

    Trace verification scenarios to requirements. Review simulation, assertions and coverage; develop the agreed scan, memory-test and ATPG approach alongside implementation planning.

    Review evidence

    Regression and coverage reports, test architecture and open-issue status.

    Decision Review functional confidence and test readiness against the plan.

  4. 04

    Physical implementation

    Progress through synthesis, floorplanning, placement, clock-tree synthesis and routing. Review timing, congestion, power and area across the agreed corners and operating modes.

    Review evidence

    Implementation database, constraints, timing and physical-analysis reports.

    Decision Review implementation results and remaining closure actions.

  5. 05

    Signoff & release review

    Run the agreed equivalence, timing and physical checks. Review DRC/LVS and power-integrity evidence where in scope, together with waivers, unresolved items and the release checklist.

    Review evidence

    Signoff report set, exception decisions and a versioned delivery manifest.

    Decision The authorised client team makes the release decision.

  6. 06

    Handoff & bring-up support

    Transfer the accepted design package with reproduction notes and interface documentation. If contracted, support the authorised manufacturing partner and plan board-level or silicon bring-up activities.

    Review evidence

    Delivery package, handoff walkthrough and scoped validation/support plan.

    Decision Confirm receiving-team readiness and follow-up ownership.

The route depends on the design, technology access and contracted scope. Foundry submission, fabrication, packaging, production test and post-silicon support require explicit responsibilities and partner agreements.

ENGAGEMENT OPTIONS

Choose the starting point
that fits your programme.

A coordinated programme

Connect multiple design disciplines under a shared technical plan. Agree inter-team dependencies, review cadence, change control and release ownership before execution.

A defined work package

Start from the current design state: a verification block, implementation milestone, DFT integration or another bounded assignment with explicit inputs and outputs.

Integration & handoff support

Review inherited collateral, close agreed integration gaps and prepare a usable release package. Assess the remaining work before committing schedule or completion criteria.

BEFORE THE FIRST TECHNICAL REVIEW

Bring the current design state.

A first conversation can begin with a non-confidential brief. Agree the appropriate confidentiality arrangements before sharing design files or restricted technology information.

THE AGREED HANDOFF

A package the next team can use.

Deliverables are agreed in the statement of work and reviewed against acceptance criteria. Available source formats, tool versions, third-party IP rights and remaining issues are recorded alongside the engineering results.

PROJECT DECISIONS

Know what moves the work forward.

Use these gates to agree readiness, review evidence and responsibility at each stage.

  1. 01

    Requirements accepted

    Is the delivery boundary clear to every team?

    Review method and evidence

    Review the specification revision, interface ownership, available IP, tool and technology access, dependencies and acceptance plan.

    Review evidence

    Approved scope, responsibility map, verification plan and a register of unresolved inputs.

  2. 02

    Integration baseline reviewed

    Do the blocks agree on their interfaces and assumptions?

    Review method and evidence

    Check the selected architecture and RTL baseline, IP configuration, clocks, resets and the verification environment used for integration.

    Review evidence

    Reviewed interface documents, versioned design collateral, integration findings and agreed changes.

  3. 03

    Release evidence reviewed

    Does the evidence cover the checks agreed for this programme?

    Review method and evidence

    Review the required functional, coverage, implementation, timing and physical results for the contracted scope. Record the configuration and limitations behind each result.

    Review evidence

    The project acceptance checklist, linked reports, exception decisions and ownership of open actions.

  4. 04

    Receiving team ready

    Can the next team reproduce and use the package?

    Review method and evidence

    Walk through delivery contents and instructions with the client or authorised downstream partner. Confirm the release decision and any remaining support responsibilities.

    Review evidence

    Delivery manifest, reproduction notes, handoff review and an agreed follow-up list.

TECHNICAL GUIDE

A turnkey programme, from decisions to deliverables.

Read the technical guide

Start with a product definition, not a tool list

A turnkey IC programme needs an agreed product specification before implementation begins. The discovery review should establish the intended application, operating conditions, interfaces, performance targets, power budget, package constraints and expected production volumes. Existing RTL, software, reference hardware and validation results help distinguish reusable work from new development. Requirements that remain open should have an owner and a decision date; they should not silently become implementation assumptions.

The output is a scoped engineering plan with clear boundaries. Architecture, RTL, verification, physical implementation, DFT, packaging coordination and post-silicon support can be included where agreed. Foundry access, third-party IP, tool licences, fabrication, assembly and test procurement need explicit ownership. An engineering engagement does not by itself include the commercial purchase of these services.

Architecture and integration planning

Architecture translates the product requirement into blocks, clocks, resets, power domains, memories and external interfaces. Early review should address throughput, latency, buffering, register behaviour, interrupt handling and software visibility. The integration plan records which blocks are supplied by the client, which are licensed from third parties and which need custom development. Each interface needs a defined protocol, timing assumption and verification responsibility.

Low-power intent and test requirements belong in this stage. Retrofitting isolation, retention or scan access after the architecture is fixed can create costly changes. An initial floorplan and memory assessment can expose area and interconnect risks before the RTL is complete. The architecture review closes when the stakeholders agree the block boundaries and the evidence needed to evaluate them.

Verification that follows the specification

The verification plan should map requirements to checks. Depending on the design, the work can include lint, clock-domain and reset-domain crossing review, simulation, assertions, formal checks, functional coverage and integration regressions. A passing test alone does not establish coverage: reviewers need to understand which behaviours were exercised, which remained unreachable and which require a justified waiver.

Changes to RTL, constraints or interface definitions should trigger the appropriate regression scope. Defects need a reproducible test, ownership and closure evidence. Verification completion is a reviewed decision against the agreed plan, with residual risks documented. Coverage percentages should always be accompanied by their measurement scope and exclusions.

Implementation and signoff preparation

The implementation phase connects synthesis, test insertion, floorplanning, placement, clock-tree synthesis and routing. Constraints, libraries, corners and extraction settings must be consistent with the target design environment. Timing, congestion, power and area are evaluated together: a local improvement can cause a regression elsewhere. Reviews should therefore compare a controlled baseline against the changed implementation.

Signoff preparation brings together timing analysis, physical verification, power integrity and the project-specific checks required by the receiving organisation. The acceptance package should identify tool versions, input revisions, analysis corners, exceptions and unresolved violations. A completed flow is not synonymous with clean signoff; the underlying reports and checks determine the result.

Tapeout handoff and post-silicon readiness

The tapeout handoff is a controlled release. The parties agree which layout data, netlists, constraints, reports, checksums and release notes must be delivered, who authorises the release and how any final engineering changes are handled. Foundry-specific requirements are confirmed with the authorised manufacturing partner. Fabrication timelines and yield cannot be inferred from completion of the design work.

Post-silicon planning should begin before silicon arrives. Bring-up firmware, board requirements, test access, expected measurements and fault-isolation procedures reduce ambiguity during initial evaluation. The validation plan should separate functional checks from performance, power and environmental characterisation. Findings return to the issue register with evidence that supports a decision about firmware changes, test changes or a silicon revision.

A practical governance and handoff model

Each milestone should have named inputs, a responsible owner, review criteria and an output package. Weekly technical reviews are useful when they focus on decisions, changes and blockers rather than activity counts. Scope changes should identify effects on schedule, effort, verification and downstream dependencies. The client should be able to see which assumptions have changed and which decisions are still required.

A useful first conversation includes the current specification, design maturity, available collateral, intended technology, schedule constraints and the preferred engagement boundary. Sensitive RTL, PDK material and customer data should be exchanged only through the agreed access process. The final statement of work defines deliverables, acceptance, support boundaries and the treatment of open issues.

Choose a delivery boundary before committing to a programme

A turnkey enquiry should identify the product objective, the starting design state and the endpoint the client wants Avecas to own. A specification-to-implementation assignment differs from a tapeout-support or post-silicon assignment. Separate design delivery from fabrication, packaging, testing and procurement. The statement of work should name the parties responsible for each activity, the required approvals and dependencies on third-party suppliers.

Start with a readiness review: specification completeness, IP availability, authorised tool and PDK access, verification maturity, integration assumptions and the intended acceptance evidence. Convert the gaps into a plan with named owners. Stage commitments around reviews so that an unresolved architecture or licensing dependency is addressed before it becomes a late delivery problem.

A practical programme can use five review gates: requirements baseline, architecture and verification plan, implementation readiness, evidence review and handoff. Each gate needs an owner and an explicit decision. A blocked gate should identify the missing evidence and the downstream activities that depend on it. Schedule and commercial commitments are agreed for the actual programme, not inferred from a generic flow diagram.

BEFORE WE BEGIN

Project questions.

A clear conversation is the start of a strong engineering relationship.

What does a turnkey engagement include?

The statement of work defines the exact design stages and deliverables. Fabrication, third-party IP licensing, packaging, and silicon test are included only when explicitly agreed.

Can an existing design be taken over?

An initial technical review establishes the condition of the RTL, constraints, verification environment, documentation, and outstanding issues before a delivery commitment is made.

PUT THE WORKFLOW IN CONTEXT

Explore the engineering decisions.

Practical reading to help prepare your project discussion. Studies are illustrative; they do not report client results.

What belongs in a turnkey IC-design project brief ↗

YOUR NEXT CHAPTER STARTS HERE

What will you
build next?

Bring us your engineering challenge.
Let’s define the path from idea to implementation.

Start a conversation