Skip to content
Avecas

CUSTOM SILICON IP

Custom silicon IP

Develop an integration-ready block around explicit interfaces, configurability, verification and implementation assumptions.

Discuss your requirements
Gold pins on the underside of a processor package

Representative photograph · Gold pins on the underside of a processor package.

THE ENGINEERING SCOPE

Built around
your requirements.

Explore the approach ↓
01

Technical starting point

Block specification, interface standards, configuration options, performance targets and integration environment.

02

Acceptance evidence

Configuration coverage, interface behaviour, reset requirements and implementation feasibility.

03

Delivery package

IP sources, verification material, integration guide, constraints and documented limitations.

CLIENT GUIDE

Scope custom silicon ip with the right evidence.

Use these technical checkpoints to make the first project review productive.

Provide before the review

  • Block specification
  • Interface standards
  • Configuration options
  • Performance targets and integration environment

Review during execution

  • Configuration coverage
  • Interface behaviour
  • Reset requirements and implementation feasibility

Agree for delivery

  • Ip sources
  • Verification material
  • Integration guide
  • Constraints and documented limitations

HOW WE WORK

Clarity at each stage.

01

Define architecture

The initial review establishes the baseline using block specification, interface standards, configuration options, performance targets and integration environment. Record gaps and dependencies before implementation.

02

Implement the block

Carry out the agreed work against the reviewed baseline. For custom silicon ip, keep the interfaces and configuration used by this stage visible to the receiving team.

03

Verify configurations

Retain the intermediate artifacts and review configuration coverage, interface behaviour, reset requirements and implementation feasibility. Investigate failures before using these results as an input to the next stage.

04

Package integration collateral

Package IP sources, verification material, integration guide, constraints and documented limitations. Review unresolved findings against the agreed acceptance criteria and assign ownership for follow-up.

PROJECT DECISIONS

Know what moves the work forward.

Use these gates to agree readiness, review evidence and responsibility at each stage.

  1. 01

    Baseline ready

    Are the starting inputs complete enough to proceed?

    Review method and evidence

    Block specification, interface standards, configuration options, performance targets and integration environment.

    Review evidence

    Record input revisions, missing material and who can resolve each dependency.

  2. 02

    Implementation reviewed

    Has the work addressed the agreed technical objective?

    Review method and evidence

    Develop an integration-ready block around explicit interfaces, configurability, verification and implementation assumptions.

    Review evidence

    Keep the intermediate artifacts with review comments and the decisions that changed the design.

  3. 03

    Evidence checked

    Can the result be reproduced and interpreted?

    Review method and evidence

    Configuration coverage, interface behaviour, reset requirements and implementation feasibility.

    Review evidence

    Capture the configuration, expected result, observed result and unresolved findings.

  4. 04

    Handoff accepted

    Can the receiving team use the delivery package?

    Review method and evidence

    IP sources, verification material, integration guide, constraints and documented limitations.

    Review evidence

    Review build or execution instructions, known limitations and ownership of follow-up actions.

INPUTS & OUTPUTS

What the work involves.

The final statement of work defines the scope and acceptance criteria.

Client inputs
Block specification, interface standards, configuration options, performance targets and integration environment.
Engineering sequence
Define architecture; implement the block; verify configurations; package integration collateral.
Outputs to agree
IP sources, verification material, integration guide, constraints and documented limitations.

TECHNICAL DECISIONS

Planning custom silicon IP.

Read the technical guide

The engineering objective

Develop an integration-ready block around explicit interfaces, configurability, verification and implementation assumptions.

The work starts from block specification, interface standards, configuration options, performance targets and integration environment. The team should identify the authoritative revision of each input and record any assumptions needed to proceed. This prevents a later result from being interpreted against a different specification or configuration.

What needs technical attention

The handoff should state supported configurations and dependencies; unsupported modes should not be implied by parameter availability.

The review centres on configuration coverage, interface behaviour, reset requirements and implementation feasibility. Each finding should identify the input revision, observed behaviour and supporting evidence. Distinguish a confirmed defect from a configuration issue, an unsupported case or an open engineering question before deciding how to resolve it.

How the work is reviewed

The practical sequence is: define architecture; implement the block; verify configurations; package integration collateral. Intermediate reviews allow the client to resolve decisions while changes are still manageable. If an input changes, identify the affected activities and repeat the checks that depend on it.

The expected package comprises IP sources, verification material, integration guide, constraints and documented limitations. Acceptance criteria should specify what the receiving team needs to reproduce, inspect or integrate these artifacts. Include known limitations and outstanding actions in that package, rather than assuming that delivery of a file implies acceptance.

Make the interface contract executable

A specification becomes useful when the team can distinguish legal behaviour from a defect at each interface. Record which side drives a transaction, when data becomes valid, how backpressure works and what happens if reset arrives during a transfer. Register descriptions should state access permissions, reset values and side effects. Configuration parameters need a supported range; a design verified in one configuration should not automatically be treated as verified in every configuration.

Performance requirements need a workload and an observation point. Specify whether a latency target measures an isolated transaction or a stream under contention. State how throughput is counted when requests stall, retry or cross clock boundaries. This makes architecture reviews more productive: a buffer, pipeline stage or arbitration change can be compared against an explicit requirement rather than a headline frequency.

Keep functional verification, structural checks and implementation feasibility as distinct review activities. A successful compile, proof or synthesis run answers the question posed by its setup; it does not establish that the setup covered the entire product requirement. Review assumptions, exclusions and unsupported modes alongside the result. Where an interface is supplied by another team, agree a small integration test and its expected response before connecting the full subsystem.

An illustrative review scenario

Consider a producer that can issue consecutive requests while its consumer occasionally stalls. Review whether the interface preserves ordering, holds data stable and resumes without losing a request. Add a reset during the stall and a boundary-length transfer. Record the expected behaviour first, then retain the test and result with the design revision. This is an illustrative review scenario, not a claim about a delivered client project.

BEFORE WE BEGIN

Project questions.

A clear conversation is the start of a strong engineering relationship.

What inputs are needed for custom silicon ip?

The starting review needs block specification, interface standards, configuration options, performance targets and integration environment. Share the current revision and known limitations so the scope reflects the actual design state.

What does the custom silicon ip handoff include?

The statement of work can define IP sources, verification material, integration guide, constraints and documented limitations. The final package should include review results and any open actions.

Which technical risks need particular attention?

The handoff should state supported configurations and dependencies; unsupported modes should not be implied by parameter availability.

Can we start with a focused technical review?

The first work package can be a review of the available inputs and the engineering questions that must be resolved. Agree its boundaries, access requirements and expected findings before committing to a larger implementation. A review should leave an actionable list of decisions, dependencies and next steps.

How are changes and unresolved findings handled?

Tie each finding to the relevant revision and supporting evidence. A change should identify the affected interfaces, activities and checks. Confirm its effect on scope and delivery with the responsible owner. At handoff, distinguish closed findings, accepted limitations and open work so that a file transfer is not mistaken for technical acceptance.

PUT THE WORKFLOW IN CONTEXT

Explore the engineering decisions.

Practical reading to help prepare your project discussion. Studies are illustrative; they do not report client results.

Reviewing custom IP before subsystem integration ↗

YOUR NEXT CHAPTER STARTS HERE

What will you
build next?

Bring us your engineering challenge.
Let’s define the path from idea to implementation.

Start a conversation