Skip to content
Avecas

PHYSICAL VERIFICATION

Physical verification

Check layout connectivity and geometry against the selected rule decks.

Discuss your requirements
Green circuit board on top of engineering drawings

Representative photograph · Green circuit board on top of engineering drawings.

THE ENGINEERING SCOPE

Built around
your requirements.

Explore the approach ↓
01

Technical starting point

Layout, source netlist, layer maps and authorised DRC/LVS decks.

02

Acceptance evidence

Connectivity, device recognition, rule coverage and waivers.

03

Delivery package

Check reports, violation dispositions and final input revision record.

CLIENT GUIDE

Scope physical verification with the right evidence.

Use these technical checkpoints to make the first project review productive.

Provide before the review

  • Layout
  • Source netlist
  • Layer maps and authorised drc/lvs decks

Review during execution

  • Connectivity
  • Device recognition
  • Rule coverage and waivers

Agree for delivery

  • Check reports
  • Violation dispositions and final input revision record

HOW WE WORK

Clarity at each stage.

01

Validate inputs

The initial review establishes the baseline using layout, source netlist, layer maps and authorised DRC/LVS decks. Record gaps and dependencies before implementation.

02

Run checks

Carry out the agreed work against the reviewed baseline. For physical verification, keep the interfaces and configuration used by this stage visible to the receiving team.

03

Classify violations

Retain the intermediate artifacts and review connectivity, device recognition, rule coverage and waivers. Investigate failures before using these results as an input to the next stage.

04

Implement and recheck fixes

Package check reports, violation dispositions and final input revision record. Review unresolved findings against the agreed acceptance criteria and assign ownership for follow-up.

PROJECT DECISIONS

Know what moves the work forward.

Use these gates to agree readiness, review evidence and responsibility at each stage.

  1. 01

    Baseline ready

    Are the starting inputs complete enough to proceed?

    Review method and evidence

    Layout, source netlist, layer maps and authorised DRC/LVS decks.

    Review evidence

    Record input revisions, missing material and who can resolve each dependency.

  2. 02

    Implementation reviewed

    Has the work addressed the agreed technical objective?

    Review method and evidence

    Check layout connectivity and geometry against the selected rule decks.

    Review evidence

    Keep the intermediate artifacts with review comments and the decisions that changed the design.

  3. 03

    Evidence checked

    Can the result be reproduced and interpreted?

    Review method and evidence

    Connectivity, device recognition, rule coverage and waivers.

    Review evidence

    Capture the configuration, expected result, observed result and unresolved findings.

  4. 04

    Handoff accepted

    Can the receiving team use the delivery package?

    Review method and evidence

    Check reports, violation dispositions and final input revision record.

    Review evidence

    Review build or execution instructions, known limitations and ownership of follow-up actions.

INPUTS & OUTPUTS

What the work involves.

The final statement of work defines the scope and acceptance criteria.

Client inputs
Layout, source netlist, layer maps and authorised DRC/LVS decks.
Engineering sequence
Validate inputs; run checks; classify violations; implement and recheck fixes.
Outputs to agree
Check reports, violation dispositions and final input revision record.

TECHNICAL DECISIONS

Planning physical verification.

Read the technical guide

The engineering objective

Check layout connectivity and geometry against the selected rule decks.

The work starts from layout, source netlist, layer maps and authorised DRC/LVS decks. The team should identify the authoritative revision of each input and record any assumptions needed to proceed. This prevents a later result from being interpreted against a different specification or configuration.

What needs technical attention

A clean result is specific to the deck, settings and input version used.

The review centres on connectivity, device recognition, rule coverage and waivers. Each finding should identify the input revision, observed behaviour and supporting evidence. Distinguish a confirmed defect from a configuration issue, an unsupported case or an open engineering question before deciding how to resolve it.

How the work is reviewed

The practical sequence is: validate inputs; run checks; classify violations; implement and recheck fixes. Intermediate reviews allow the client to resolve decisions while changes are still manageable. If an input changes, identify the affected activities and repeat the checks that depend on it.

The expected package comprises check reports, violation dispositions and final input revision record. Acceptance criteria should specify what the receiving team needs to reproduce, inspect or integrate these artifacts. Include known limitations and outstanding actions in that package, rather than assuming that delivery of a file implies acceptance.

Separate implementation estimates from release evidence

Physical implementation starts with consistency between the logical design, constraints and technology views. Review clock definitions, generated clocks, I/O delays, operating modes and exceptions before interpreting timing. A missing constraint can make a report appear healthier while leaving a real path unevaluated. Record the library and extraction corners used so results from different stages can be compared on the same basis.

Floorplan decisions influence routing, clock distribution and power delivery together. Reserve space for macro access, power connections, congestion relief and the paths that need predictable delay. A local timing improvement may add buffering, increase switching power or create routing pressure elsewhere. Review these effects across the agreed modes and corners instead of accepting an improvement in one summary number.

As the design moves from placement through clock construction and routing, replace estimates with the appropriate extracted evidence. Classify violations by cause and ownership. An ECO should carry its logical intent, the affected paths, implementation changes and the checks that must be repeated. The release checklist should identify required reports and any formally accepted exceptions; the presence of a layout file alone is not a signoff decision.

An illustrative review scenario

An added pipeline register may improve a setup path while creating short hold paths and changing clock-tree loading. Compare both setup and hold at the agreed corners, review new buffering and check routing and power effects. Retain before-and-after reports from a controlled baseline. This illustrative example explains review scope; it does not promise a particular power, performance or area result.

BEFORE WE BEGIN

Project questions.

A clear conversation is the start of a strong engineering relationship.

What inputs are needed for physical verification?

The starting review needs layout, source netlist, layer maps and authorised DRC/LVS decks. Share the current revision and known limitations so the scope reflects the actual design state.

What does the physical verification handoff include?

The statement of work can define check reports, violation dispositions and final input revision record. The final package should include review results and any open actions.

Which technical risks need particular attention?

A clean result is specific to the deck, settings and input version used.

Can we start with a focused technical review?

The first work package can be a review of the available inputs and the engineering questions that must be resolved. Agree its boundaries, access requirements and expected findings before committing to a larger implementation. A review should leave an actionable list of decisions, dependencies and next steps.

How are changes and unresolved findings handled?

Tie each finding to the relevant revision and supporting evidence. A change should identify the affected interfaces, activities and checks. Confirm its effect on scope and delivery with the responsible owner. At handoff, distinguish closed findings, accepted limitations and open work so that a file transfer is not mistaken for technical acceptance.

PUT THE WORKFLOW IN CONTEXT

Explore the engineering decisions.

Practical reading to help prepare your project discussion. Studies are illustrative; they do not report client results.

Reviewing a congested floorplan before timing closure ↗

YOUR NEXT CHAPTER STARTS HERE

What will you
build next?

Bring us your engineering challenge.
Let’s define the path from idea to implementation.

Start a conversation