Technical starting point
Floorplan, supply domains, current estimates and metal rules.
POWER DELIVERY NETWORK
Plan on-chip power connectivity around current demand and physical constraints.
Discuss your requirements
Representative photograph · Multimeter and test leads beside electronic components.
THE ENGINEERING SCOPE
Floorplan, supply domains, current estimates and metal rules.
Connectivity, IR drop assumptions, current density and routing interaction.
PDN specification, implementation settings and analysis reports.
CLIENT GUIDE
Use these technical checkpoints to make the first project review productive.
HOW WE WORK
The initial review establishes the baseline using floorplan, supply domains, current estimates and metal rules. Record gaps and dependencies before implementation.
Carry out the agreed work against the reviewed baseline. For power delivery network, keep the interfaces and configuration used by this stage visible to the receiving team.
Retain the intermediate artifacts and review connectivity, IR drop assumptions, current density and routing interaction. Investigate failures before using these results as an input to the next stage.
Package PDN specification, implementation settings and analysis reports. Review unresolved findings against the agreed acceptance criteria and assign ownership for follow-up.
PROJECT DECISIONS
Use these gates to agree readiness, review evidence and responsibility at each stage.
Are the starting inputs complete enough to proceed?
Floorplan, supply domains, current estimates and metal rules.
Record input revisions, missing material and who can resolve each dependency.
Has the work addressed the agreed technical objective?
Plan on-chip power connectivity around current demand and physical constraints.
Keep the intermediate artifacts with review comments and the decisions that changed the design.
Can the result be reproduced and interpreted?
Connectivity, IR drop assumptions, current density and routing interaction.
Capture the configuration, expected result, observed result and unresolved findings.
Can the receiving team use the delivery package?
PDN specification, implementation settings and analysis reports.
Review build or execution instructions, known limitations and ownership of follow-up actions.
INPUTS & OUTPUTS
The final statement of work defines the scope and acceptance criteria.
TECHNICAL DECISIONS
Plan on-chip power connectivity around current demand and physical constraints.
The work starts from floorplan, supply domains, current estimates and metal rules. The team should identify the authoritative revision of each input and record any assumptions needed to proceed. This prevents a later result from being interpreted against a different specification or configuration.
Power integrity results depend on activity and source assumptions that should accompany the report.
The review centres on connectivity, IR drop assumptions, current density and routing interaction. Each finding should identify the input revision, observed behaviour and supporting evidence. Distinguish a confirmed defect from a configuration issue, an unsupported case or an open engineering question before deciding how to resolve it.
The practical sequence is: design grid topology; connect macros and cells; analyse supply drop; refine weak regions. Intermediate reviews allow the client to resolve decisions while changes are still manageable. If an input changes, identify the affected activities and repeat the checks that depend on it.
The expected package comprises PDN specification, implementation settings and analysis reports. Acceptance criteria should specify what the receiving team needs to reproduce, inspect or integrate these artifacts. Include known limitations and outstanding actions in that package, rather than assuming that delivery of a file implies acceptance.
Physical implementation starts with consistency between the logical design, constraints and technology views. Review clock definitions, generated clocks, I/O delays, operating modes and exceptions before interpreting timing. A missing constraint can make a report appear healthier while leaving a real path unevaluated. Record the library and extraction corners used so results from different stages can be compared on the same basis.
Floorplan decisions influence routing, clock distribution and power delivery together. Reserve space for macro access, power connections, congestion relief and the paths that need predictable delay. A local timing improvement may add buffering, increase switching power or create routing pressure elsewhere. Review these effects across the agreed modes and corners instead of accepting an improvement in one summary number.
As the design moves from placement through clock construction and routing, replace estimates with the appropriate extracted evidence. Classify violations by cause and ownership. An ECO should carry its logical intent, the affected paths, implementation changes and the checks that must be repeated. The release checklist should identify required reports and any formally accepted exceptions; the presence of a layout file alone is not a signoff decision.
An added pipeline register may improve a setup path while creating short hold paths and changing clock-tree loading. Compare both setup and hold at the agreed corners, review new buffering and check routing and power effects. Retain before-and-after reports from a controlled baseline. This illustrative example explains review scope; it does not promise a particular power, performance or area result.
BEFORE WE BEGIN
A clear conversation is the start of a strong engineering relationship.
The starting review needs floorplan, supply domains, current estimates and metal rules. Share the current revision and known limitations so the scope reflects the actual design state.
The statement of work can define PDN specification, implementation settings and analysis reports. The final package should include review results and any open actions.
Power integrity results depend on activity and source assumptions that should accompany the report.
The first work package can be a review of the available inputs and the engineering questions that must be resolved. Agree its boundaries, access requirements and expected findings before committing to a larger implementation. A review should leave an actionable list of decisions, dependencies and next steps.
Tie each finding to the relevant revision and supporting evidence. A change should identify the affected interfaces, activities and checks. Confirm its effect on scope and delivery with the responsible owner. At handoff, distinguish closed findings, accepted limitations and open work so that a file transfer is not mistaken for technical acceptance.
PUT THE WORKFLOW IN CONTEXT
Practical reading to help prepare your project discussion. Studies are illustrative; they do not report client results.
Reviewing a congested floorplan before timing closure ↗YOUR NEXT CHAPTER STARTS HERE
Bring us your engineering challenge.
Let’s define the path from idea to implementation.