Skip to content
Avecas

TECHNOLOGY MODELS

Technology models

Maintain model and technology references used by design tools.

Discuss your requirements
Semiconductor wafer positioned beneath manufacturing equipment

Representative photograph · Semiconductor wafer positioned beneath manufacturing equipment.

THE ENGINEERING SCOPE

Built around
your requirements.

Explore the approach ↓
01

Technical starting point

Source collateral, units, corner definitions and consuming tool formats.

02

Acceptance evidence

Parameter consistency, unsupported constructs and corner mapping.

03

Delivery package

Model files, conversion notes and regression results.

CLIENT GUIDE

Scope technology models with the right evidence.

Use these technical checkpoints to make the first project review productive.

Provide before the review

  • Source collateral
  • Units
  • Corner definitions and consuming tool formats

Review during execution

  • Parameter consistency
  • Unsupported constructs and corner mapping

Agree for delivery

  • Model files
  • Conversion notes and regression results

HOW WE WORK

Clarity at each stage.

01

Check source data

The initial review establishes the baseline using source collateral, units, corner definitions and consuming tool formats. Record gaps and dependencies before implementation.

02

Map formats

Carry out the agreed work against the reviewed baseline. For technology models, keep the interfaces and configuration used by this stage visible to the receiving team.

03

Create reference cases

Retain the intermediate artifacts and review parameter consistency, unsupported constructs and corner mapping. Investigate failures before using these results as an input to the next stage.

04

Compare tool behaviour

Package model files, conversion notes and regression results. Review unresolved findings against the agreed acceptance criteria and assign ownership for follow-up.

PROJECT DECISIONS

Know what moves the work forward.

Use these gates to agree readiness, review evidence and responsibility at each stage.

  1. 01

    Baseline ready

    Are the starting inputs complete enough to proceed?

    Review method and evidence

    Source collateral, units, corner definitions and consuming tool formats.

    Review evidence

    Record input revisions, missing material and who can resolve each dependency.

  2. 02

    Implementation reviewed

    Has the work addressed the agreed technical objective?

    Review method and evidence

    Maintain model and technology references used by design tools.

    Review evidence

    Keep the intermediate artifacts with review comments and the decisions that changed the design.

  3. 03

    Evidence checked

    Can the result be reproduced and interpreted?

    Review method and evidence

    Parameter consistency, unsupported constructs and corner mapping.

    Review evidence

    Capture the configuration, expected result, observed result and unresolved findings.

  4. 04

    Handoff accepted

    Can the receiving team use the delivery package?

    Review method and evidence

    Model files, conversion notes and regression results.

    Review evidence

    Review build or execution instructions, known limitations and ownership of follow-up actions.

INPUTS & OUTPUTS

What the work involves.

The final statement of work defines the scope and acceptance criteria.

Client inputs
Source collateral, units, corner definitions and consuming tool formats.
Engineering sequence
Check source data; map formats; create reference cases; compare tool behaviour.
Outputs to agree
Model files, conversion notes and regression results.

TECHNICAL DECISIONS

Planning technology models.

Read the technical guide

The engineering objective

Maintain model and technology references used by design tools.

The work starts from source collateral, units, corner definitions and consuming tool formats. The team should identify the authoritative revision of each input and record any assumptions needed to proceed. This prevents a later result from being interpreted against a different specification or configuration.

What needs technical attention

A format conversion must preserve meaning, not just pass a parser.

The review centres on parameter consistency, unsupported constructs and corner mapping. Each finding should identify the input revision, observed behaviour and supporting evidence. Distinguish a confirmed defect from a configuration issue, an unsupported case or an open engineering question before deciding how to resolve it.

How the work is reviewed

The practical sequence is: check source data; map formats; create reference cases; compare tool behaviour. Intermediate reviews allow the client to resolve decisions while changes are still manageable. If an input changes, identify the affected activities and repeat the checks that depend on it.

The expected package comprises model files, conversion notes and regression results. Acceptance criteria should specify what the receiving team needs to reproduce, inspect or integrate these artifacts. Include known limitations and outstanding actions in that package, rather than assuming that delivery of a file implies acceptance.

Make the flow reproducible and failures visible

An EDA or design-enablement flow combines tools, libraries, technology data, scripts and project configuration. Establish the supported versions and the authority for each input. Confirm access rights and permitted use of PDK and IP material before sharing it. Keep confidential collateral within the approved environment; an automation task should not silently change where protected files are stored.

Automation needs explicit success criteria at each stage. Capture exit status and the reports that establish whether the stage achieved its engineering objective. A command finishing without an error message may still leave missing outputs, incomplete analysis or unacceptable violations. Make restart behaviour and dependencies visible so a partial rerun cannot accidentally combine incompatible revisions.

Validate a methodology change on representative cases, including a deliberately failing case where practical. Compare results and runtime with the baseline, then explain differences. Package usage instructions, required configuration, supported platforms and limitations with the scripts. Reference checks help teams recognise a broken environment before a large production run consumes time and compute.

An illustrative review scenario

A wrapper script reports success after a tool writes a warning and omits the expected output database. Add a check for the required artifact and its associated report, retain the tool log and return a failing stage status. Re-run both a known-good case and a controlled failure. This illustrates flow validation rather than endorsing any specific vendor setup.

Keep technology views consistent

Identify the authoritative technology source and the allowed transformations before generating any derived file. Record units, naming conventions, layer mappings, operating conditions and tool compatibility. Validate generated views against known structures and the checks agreed with the technology owner. A syntactically accepted file can still contain an incorrect mapping or assumption that changes downstream results. Preserve the source revision, generation scripts and validation evidence together. Review discrepancies across physical, timing and extraction views before release. Distribution and access must follow the applicable technology agreements; a methodology description does not grant permission to redistribute proprietary PDK or library data.

BEFORE WE BEGIN

Project questions.

A clear conversation is the start of a strong engineering relationship.

What inputs are needed for technology models?

The starting review needs source collateral, units, corner definitions and consuming tool formats. Share the current revision and known limitations so the scope reflects the actual design state.

What does the technology models handoff include?

The statement of work can define model files, conversion notes and regression results. The final package should include review results and any open actions.

Which technical risks need particular attention?

A format conversion must preserve meaning, not just pass a parser.

Can we start with a focused technical review?

The first work package can be a review of the available inputs and the engineering questions that must be resolved. Agree its boundaries, access requirements and expected findings before committing to a larger implementation. A review should leave an actionable list of decisions, dependencies and next steps.

How are changes and unresolved findings handled?

Tie each finding to the relevant revision and supporting evidence. A change should identify the affected interfaces, activities and checks. Confirm its effect on scope and delivery with the responsible owner. At handoff, distinguish closed findings, accepted limitations and open work so that a file transfer is not mistaken for technical acceptance.

PUT THE WORKFLOW IN CONTEXT

Explore the engineering decisions.

Practical reading to help prepare your project discussion. Studies are illustrative; they do not report client results.

Making an EDA run reproducible across engineering handoffs ↗

YOUR NEXT CHAPTER STARTS HERE

What will you
build next?

Bring us your engineering challenge.
Let’s define the path from idea to implementation.

Start a conversation